Search Results: “” — Page 1

Steven Rosin and Chen Han Shan

Tailings dam rehabilitation is a major challenge for the mining industry in China requiring a multi-disciplinary approach. A team of Chinese and Australian professionals have recently completed a 4-year project to develop guidelines for rehabilitation procedures for tailings dams in China.

This paper focuses on the geotechnical stability issues that were required to be addressed as part of dam rehabilitation assessment. It also discusses Chinese practices in tailings dam design and operation considered for the assessment. Three case studies are presented from sites in various parts of China.

Now showing all 6 search results

  • $15.00
    1998  Papers

    1998 – Geotechnical Assessment and Rehabilitation Challenges for Tailings Dams in China

    Learn more
    Learn more
  • $15.00
    2015  Papers

    2015 – Anomalies in design for mining dams

    Learn more
    Learn more
  • $15.00
    2019  Papers

    2019 – In Defence of Upstream Tailings Dam Construction

    Learn more
    Learn more
  • $15.00
    2009  Papers

    2009 – Geotechnical characterisation of tailings and failure mode analysis for tailings dam cover design

    Learn more
    Learn more
  • $15.00
    2009  Papers

    2009 – ANCOLD Guidelines on Planning, Design and Operation of Tailings Dams- Report on Progress of Review and Update

    Learn more
    Learn more
  • $15.00
    2011  Papers

    2011 – The Challenges of Building Tailings Dams in Seismic Regions

    Learn more
    Learn more
{"cart_token":"","hash":"","cart_data":""}