Search Results: “” — Page 1

A. Khan

SunWater manages its portfolio of 29 major dams through 6 business centres each responsible for the Dam Safety Program for the dams under its management control.

The effectiveness of responses during an emergency depends on the amount of planning and training performed. Management must show its support for dam safety programs and the importance of emergency planning.

If management is not interested in community protection and in minimising property loss, little can be done to promote dam safety. It is therefore management’s responsibility to see that a program is instituted and that it is frequently reviewed and updated.

The input and support of all communities must be obtained to ensure an effective program. The emergency response plan should be developed locally and should be comprehensive enough to deal with all types of emergencies specific to that site.

SunWater is a responsible dam owner and has recently upgraded all its emergency action plans in consultation with emergency services of Queensland. This paper details the basic steps to handle emergencies of water infrastructure. These emergencies include inflow floods, rapid drawdown, earthquake, sunny day failure, changes in reservoir water quality and terrorist attacks including hoax.

This paper is intended to assist small dam owners that do not have dam safety programs in place. It is not intended as an all inclusive safety program but rather a provision of guidelines for planning for emergencies.

Now showing all 6 search results

  • $15.00
    2006  Papers

    2006 – Emergency Action Planning for SunWater Dams

    Learn more
    Learn more
  • $15.00
    2008  Papers

    2008 – Design considerations for upgrading SunWater’s dams for acceptable flood capacity

    Learn more
    Learn more
  • $15.00
    2008  Papers

    2008 – Fairbairn Dam – performance during flood of record

    Learn more
    Learn more
  • $15.00
    2008  Papers

    2008 – Design Rainfall Issues in South East Queensland

    Learn more
    Learn more
  • $15.00
    2009  Papers

    2009 – Ross River Dam Upgrade – Flood Commissioning Experience

    Learn more
    Learn more
  • $15.00
    2010  Papers

    2010 – Bowen River Weir Fishway – Design and Construction

    Learn more
    Learn more