Following the catastrophic failure of the bottom outlet conduits of the Massingir Dam, a rehabilitation project was launched involving the installation of steel liners and the rehabilitation of the hydromechanical equipment. This paper describes the testing of an emergency gates for possible use as a control gate to maintain supply to downstream water users. It further describes the innovative use of alternative access for concreting and other services, the use and benefits of self-compacting concrete for infill concreting between the steel liner and existing concrete and the programme and cost benefits of pressurising the steel conduit prior to concrete encasement.