Search Results: “” — Page 1
K. Chandler, D. Gill, B. Maher, S. Macnish and G. Roads
SEQWater is the major supplier of untreated water in bulk to Local Governments and industry in the South East Queensland region of Australia, through ownership of Wivenhoe, Somerset and North Pine Dams. Wivenhoe Dam (Lake Wivenhoe) is located on the Brisbane River in Esk Shire. The storage provides both flood mitigation and water supply storage to Brisbane and Ipswich. The water supply storage capacity at full supply level is 1,160 GL. An additional 1,450 GL of storage above full supply level is used for flood mitigation.
Changes to the estimation of extreme rainfall events has resulted in significant increases in the estimates of the PMF since the original design of Wivenhoe Dam. To upgrade the flood security of Wivenhoe Dam, SEQWater has formed an alliance with Leighton Contractors, Coffey Geosciences, MWH and the NSW Department of Commerce.
This paper details the alliance delivery method, the latest estimates of the PMF based on the GTSMR method and details of the two preferred options being finalised by the Alliance.
Now showing all 2 search results
-
$15.00
2003 Papers
2003 – Coping with Probable Maximum Flood – An Alliance Project Delivery for Wivenhoe Dam
Learn more
Learn more
K. Chandler, D. Gill, B. Maher, S. Macnish and G. Roads
SEQWater is the major supplier of untreated water in bulk to Local Governments and industry in the South East Queensland region of Australia, through ownership of Wivenhoe, Somerset and North Pine Dams. Wivenhoe Dam (Lake Wivenhoe) is located on the Brisbane River in Esk Shire. The storage provides both flood mitigation and water supply storage to Brisbane and Ipswich. The water supply storage capacity at full supply level is 1,160 GL. An additional 1,450 GL of storage above full supply level is used for flood mitigation.
Changes to the estimation of extreme rainfall events has resulted in significant increases in the estimates of the PMF since the original design of Wivenhoe Dam. To upgrade the flood security of Wivenhoe Dam, SEQWater has formed an alliance with Leighton Contractors, Coffey Geosciences, MWH and the NSW Department of Commerce.
This paper details the alliance delivery method, the latest estimates of the PMF based on the GTSMR method and details of the two preferred options being finalised by the Alliance.
Learn more
-
$15.00
2003 Papers
2003 – Option Investigation and Design Approach on the Wivenhoe Dam Spillway Augmentation
Learn more
Learn more
A. Ahmed-Zeki, G. Roads
South East Queensland Water Corporation (SEQWater) as owner and operator is proceeding with an upgrade of the flood capacity of Wivenhoe Dam. SEQWater has formed an Alliance with Leighton Contractors, Coffey Geosciences, Montgomery Watson Harza (MWH) and the Department of Commerce-NSW (formerly DPWS, NSW) to upgrade Wivenhoe Dam. This paper presents feasibility level investigation and design activities for an upgrade option, comprising a large labyrinth auxiliary spillway at the right abutment of the dam, for supplementing the existing gated spillway in handling the Probable Maximum Flood (PMF) event. This right abutment auxiliary spillway option incorporates Hydroplus type concrete fuse gates. The investigation so far has proved the technical viability of this option, however, ranking along with the other three options against various criteria will lead to the selection of the preferred upgrade option.
Learn more