Peter Buchanan, Malcolm Barker, Paul Maisano, Marius Jonker
Kangaroo Creek Dam located on the Torrens River, approximately 22 km north east of Adelaide, is currently undergoing a major upgrade to address a number of deficiencies, including increasing flood capacity and reducing its vulnerability to major seismic loading.
Originally constructed in the 1960s and raised in 1983, recent reviews have indicated that the dam does not meet modern standards for an extreme consequence category dam.
The original dam was generally constructed from the rock won from the spillway excavation. This rock was quite variable in quality and strength and contained significant portions of low strength schist, which broke down when compacted by the rollers. The nature of this material in places is very fine with characteristics more akin to soil than rock. Review of this material suggests that large seepage flows (say following a major seismic event and rupture of the upstream face slab) could lead to extensive migration of the finer material and possible failure of the embankment. However, it is also envisaged that the zones of coarser material could behave as a rockfill and therefore transmit large seepage flows, which may result in unravelling of the downstream face leading to instability.
This paper addresses the design of the embankment raising and stabilising providing suitable protection against both these possible failure scenarios, which tend to lead to competing solutions. The final solution required the embankment to be considered both as a CFRD and a zoned earth and rockfill embankment.
Now showing all 2 search results
-
$15.00
2016 Papers
2016 – Kangaroo Creek Dam Embankment Raising and Stabilisation – Balancing Competing Objectives
Learn more
Learn more
Peter Buchanan, Malcolm Barker, Paul Maisano, Marius Jonker
Kangaroo Creek Dam located on the Torrens River, approximately 22 km north east of Adelaide, is currently undergoing a major upgrade to address a number of deficiencies, including increasing flood capacity and reducing its vulnerability to major seismic loading.
Originally constructed in the 1960s and raised in 1983, recent reviews have indicated that the dam does not meet modern standards for an extreme consequence category dam.
The original dam was generally constructed from the rock won from the spillway excavation. This rock was quite variable in quality and strength and contained significant portions of low strength schist, which broke down when compacted by the rollers. The nature of this material in places is very fine with characteristics more akin to soil than rock. Review of this material suggests that large seepage flows (say following a major seismic event and rupture of the upstream face slab) could lead to extensive migration of the finer material and possible failure of the embankment. However, it is also envisaged that the zones of coarser material could behave as a rockfill and therefore transmit large seepage flows, which may result in unravelling of the downstream face leading to instability.
This paper addresses the design of the embankment raising and stabilising providing suitable protection against both these possible failure scenarios, which tend to lead to competing solutions. The final solution required the embankment to be considered both as a CFRD and a zoned earth and rockfill embankment.
Learn more
-
$15.00
2010 Papers
2010 – Overview of Recent Dam Safety Activity on the Waikato Hydro System
Learn more
Learn more
Justin Howes, Peter Amos
For many years Mighty River Power has operated an intensive Dam Safety Assurance Programme with respect to our nine large hydro assets, a unique run of river cascade system built between 1927 and 1972. From 2001 to 2007 the Arapuni Foundation Enhancement Project was a high profile activity, but there has also been much dam safety analysis and minor mitigation work that could be classified as “Business As Usual Dam Safety Activity” – this paper seeks to give a high level overview of the work carried out from 2000 to 2010. Items covered include; an overview of the hydraulic structures, their hydrological and geological setting, and the current dam safety regime. Examples of typical issues identified by the Programme are given on a structure by structure basis along the river. Seismic, Flooding, Emergency Planning, Documentation, Monitoring, Control, Electrical and Mechanical type issues are covered.