2022 – The Limitations of Methods of Stability Analyses, and Potential Disconnect between Deterministic and Risk – based Acceptance Criteria for Concrete Gravity Dams. $15.00 More info
2022 – The Bureau of Reclamation approach to risk analysis and risk informed decision making – past successes, current challenges, and future direction $15.00 More info
2022 – Extension Strains in Embankment Dams and the Potential for Development of Transverse Cracks $15.00 More info
2021 – Risk analysis and safety upgrade of Mangrove Creek Dam; SFAIRP assessment under Dam Safety NSW regulations $15.00 More info
2019 – Estimating Design Floods with a Specified Annual Exceedance Probability Using Bayesian Analysis $15.00 More info
2018 – A Robust and Efficient Stochastic Simulation Framework for Estimating Reservoir Stage-Frequency Curves with Uncertainty Bounds $15.00 More info
2017 – Seqwater Dam Improvement Program – Assessment, Prioritisation, Justification and Implementation of Dam Upgrades $15.00 More info
2016 – Would Bowties and Critical Controls Contribute to the Prevention of High Consequence / Low Frequency Dam Failures? $15.00 More info
2016 – Towards Improved Efficiency of Dambreak Modelling and Consequence Assessment Projects $15.00 More info
2016 – Estimating the Probability of Breach for Overtopping of Low to Medium Height Homogenous Earthfill Embankments $15.00 More info
2014 – Beyond Quantitative ALARP – Re-Focussing Paradigms for Dam Safety Risk Management in a Changed Legal Environment $15.00 More info
2013 – Flooded cars: estimating the consequences to itinerants exposed to dam break floods on roads $15.00 More info
2013 – Development and application of a risk based approach to managing floods during construction $15.00 More info
2013 – Case study of risk assessment for dam safety management decision-making in Korea $15.00 More info
2013 – A case study: how to minimise risks associated with a portfolio of non-revenue generating dams $15.00 More info
2012 – Oberon Dam – Failure hazard of a buttress dam and its vulnerability to earthquake damage $15.00 More info
2011 – Investigating the Piping Risk Associated with Seepage at Monbulk Saddle Dam of Silvan Reservoir, Victoria $15.00 More info
2011 – How SunWater, as a commercial dam owner makes investment decisions for dam safety upgrades $15.00 More info
2011 – How do you solve a problem like retarding basins? An asset owner’s perspective $15.00 More info
2010 – A risk-based re-evaluation of reservoir operating restrictions to reduce the risk of failure from earthquake and piping $15.00 More info
2008 – Risk assessment with uncertainty analysis for an already-initiated failure mode $15.00 More info
2008 – Proposed changes to the UK Reservoir Safety Legislation to incorporate a risk based approach and the problems the UK faces into future $15.00 More info
2008 – Risk assessment in spillway remedial works design and construction and monitoring at Googong Dam $15.00 More info