Ahmad Shayan, Robert J. Wark and John Waters
The Canning Dam concrete gravity structure located in Western Australia has shown an upward movement of 18.3 mm and lateral upstream movement of 14.2 mm over the past 15 years of monitoring. These movements have been associated with considerable cracking of the upper parts of the dam and the upper gallery. Investigations have shown that the cause of the cracking was a strong alkali-aggregate reaction (AAR) in the concrete, brought about by a deformed granitic rock. Extensive horizontal and vertical cracking in the upper part of the dam wall has necessitated the removal of the section above the floor of the upper gallery level, and construction of a new reinforced concrete section to act as head beam for post-tensioning of the rest of the dam wall.
A set of small diameter cores were taken from the various parts for diagnostic purposes, and a vertical core of 100 mm diameter was taken through the whole thickness of the wall for the determination of the strength properties, alkali content and residual expansion potential. Based on these, a post-tensioning stress of 1.5-2.0 MPa has been calculated for restraining the residual expansion of the concrete. The spillway bridge structure which is part of the dam wall has also shown mild signs of deterioration. The piers and abutment walls and the deck were surveyed for corrosion activity and extent of AAR. This work showed that the spillway bridge structure was sound and only needed maintenance. The performance of a triple blend concrete mix containing a high volume of fly ash (45%) and silica fume (5%) developed for the replacement of the old concrete is also discussed.
Now showing all 10 search results
-
$15.00
1999 Papers
1999 – Investigations on Canning Dam Concrete Gravity Structure and it’s Rehabilitation
Learn more -
$15.00
2000 Papers
2000 – Hume Dam Rehabilitation – An Owner’s Perspective
Learn more -
$15.00
2001 Papers
2001 – Restoration of Storage Capacity at Lyell Dam
Learn more -
$15.00
2001 Papers
2001 – Sustainable Rehabilitation of Gravity Dams Using Post-Tensioned Anchors
Learn more -
$15.00
2002 Papers
2002 – Restoration of Storage Capacity at Lyell Dam Using Hydroplus Fusegates and Construction Stages
Learn more -
$15.00
2003 Papers
2003 – Increasing Storafe Capacity at Dartmouth Regulatory Dam with Fusegates: The Construction Stage
Learn more -
$15.00
2003 Papers
2003 – INVESTIGATIONS AND DESIGN OF UPGRADE WORKS AT TANK HILL RESERVOIR IN VICTORIA
Learn more -
$15.00
2018 Papers
2018 – Ash Tailings Dam Rehabilitation – Challenges and Aspirational Targets
Learn more -
$15.00
2018 Papers
2018 – Massingir Dam Rehabilitation Project: Construction and Operational Challenges
Learn more -
$15.00
2011 Papers
2011 – Refurbishment of Ambuklao and Binga Hydro Power Dams and Appurtenant Works
Learn more