Search Results: “” — Page 1
Changes to the Regulatory and legal environment have resulted in an increased focus on the
importance of proficient management of dams. Operation and maintenance manuals are now a
Regulatory requirement in Tasmania for all but very low hazard dams and are also required to ensure that dams are managed efficiently and safely. To meet these requirements Hydro Tasmania has developed the ‘Smart’ operations and maintenance manual.
Hydro Tasmania has a large portfolio of dams and as a result requires a large number of operations and maintenance manuals. This would result in an overwhelming array of information that is subject to evolving change if the traditional approach to the manual was adopted. To overcome this burden, a controlled electronic manual was developed to enable:
• Critical operation and maintenance information to be collated with minimal effort;
• Electronic hyperlinks to key existing operation and maintenance documents, reference
materials, and portals into operational data bases; and
• A means of updating and controlling information that is subject to change.
This paper will discuss how Hydro Tasmania developed its user-friendly operation and maintenance manuals in an innovative, unique and controlled manner to ensure prudent management of dams and to comply with Regulatory change.
Now showing all 8 search results
-
$15.00
2005 Papers
2005 – THE SMART GUIDE TO OPERATIONS AND MAINTENANCE MANUALS
Learn more -
$15.00
2005 Papers
2005 – The Smart Guide to Operations and Maintenance Manuals
Learn more -
$15.00
2014 Papers
2014 – Blowing in the Wind: Reassessment of the Existing Rowallan Dam Spillway Walls – Performance and Design Approach
Learn more -
$15.00
2017 Papers
2017 – Decommissioning of Roaring Meg Dam and Cutten Street Dam No 3 – Creating a New Legacy
Learn more -
$15.00
2017 Papers
2017 – Nagmati Dam – A Project of Environmental and Cultural Significance
Learn more -
$15.00
2014 Papers
2014 – Crack Repair on Outlet Conduits – The Hunt for the Appropriate Method
Learn more -
$15.00
2008 Papers
2008 – Construction of a full height filter buttress against a full reservoir at Dee Dam
Learn more