Michael Bassett-Foss , David Bouma , Dewi Knappstein
The Wairarapa Water Use Project (WWUP) in the southern North Island, New Zealand, is investigating new water storage schemes involving large dams that will allow the community to make use of the water resources that are currently available, but not necessarily available at the time they are needed. It is estimated that the 12,000 hectares currently irrigated in the Wairarapa could be increased to about 42,000 hectares depending on actual demand. The WWUP provides for a range of possible needs, such as supply of new areas of irrigation, increased reliability for existing irrigation and frost fighting, environmental augmentation of low summer river flows, environmental flushing flows, stock drinking water, power generation, municipal water supply, and recreational use.
WWUP objectives include early engagement of stakeholders, early integration of financial, social, cultural and environmental factors in decision-making, management of uncertainty associated with the preliminary level of investigation and evolving regulatory framework, development of an equitable framework for efficiently comparing options, and balancing long and short-term considerations.
A large number of dam options were identified, storing 3 to 80 million m3 of water, and progressively narrowed to a shortlist of 2 sites through a complex process of concept development, desktop studies, site visits, hydrological analyses, cost estimates and multi-criteria analyses.
The WWUP demonstrates how sustainable new major water storage schemes can be promoted in a highly regulated environment of a developed nation.
Keywords: Dams, water storage, stakeholder engagement, environment, water allocation, multi-criteria analysis
Now showing all 2 search results
-
$15.00
2015 Papers
2015 – A regional study of water storage options in the Wairarapa
Learn more
Learn more
Michael Bassett-Foss , David Bouma , Dewi Knappstein
The Wairarapa Water Use Project (WWUP) in the southern North Island, New Zealand, is investigating new water storage schemes involving large dams that will allow the community to make use of the water resources that are currently available, but not necessarily available at the time they are needed. It is estimated that the 12,000 hectares currently irrigated in the Wairarapa could be increased to about 42,000 hectares depending on actual demand. The WWUP provides for a range of possible needs, such as supply of new areas of irrigation, increased reliability for existing irrigation and frost fighting, environmental augmentation of low summer river flows, environmental flushing flows, stock drinking water, power generation, municipal water supply, and recreational use.
WWUP objectives include early engagement of stakeholders, early integration of financial, social, cultural and environmental factors in decision-making, management of uncertainty associated with the preliminary level of investigation and evolving regulatory framework, development of an equitable framework for efficiently comparing options, and balancing long and short-term considerations.
A large number of dam options were identified, storing 3 to 80 million m3 of water, and progressively narrowed to a shortlist of 2 sites through a complex process of concept development, desktop studies, site visits, hydrological analyses, cost estimates and multi-criteria analyses.
The WWUP demonstrates how sustainable new major water storage schemes can be promoted in a highly regulated environment of a developed nation.
Keywords: Dams, water storage, stakeholder engagement, environment, water allocation, multi-criteria analysis
Learn more
-
$15.00
2013 Papers
2013 – Maroon Dam: A multi-analytical approach for a multi-purpose dam
Learn more
Learn more
Iain Lonie, Malcolm Barker and Colin Thompson
Consideration of flood mitigation benefits, water supply, irrigation and recreational usage played an instrumental role in developing the proposed upgrade for Maroon Dam to meet dam safety and flood capacity requirements. Maroon Dam is a 47.4 m high zoned earthfill dam completed in 1974. The dam is a multi-purpose reservoir which is now owned and operated by Seqwater and plays an important role in the local community. Key drivers for the proposed upgrade design included embankment stability, foundation concerns, piping, spillway capacity and erosion of the embankment toe.
Six options were reduced to three through a high level screening exercise. A more detailed assessment of the remaining options was undertaken using a Multi Criteria Analysis and a detailed risk assessment. Consideration of the competing uses of the reservoir was critical in the development and assessment of the preferred option. This paper will present the details of the analytical methods used as input for the Multi Criteria Analysis and the detailed risk assessment for the final proposed design option that will meet the requirements of dam safety and flood capacity without impacting on water supply, irrigation and recreational usage.
Learn more