Search Results: “” — Page 1
Simon Lang, Chriselyn Meneses, Kelly Maslin, Mark Arnold
It is now common practice for dam owners in Australia to take a risk based approach to managing the safety of their large dams. Some dam owners are also using risk based approaches to manage other significant assets. For example, Melbourne Water manage the safety of their retarding basins in a manner similar to their water supply dams.
Assessing the risks posed by retarding basins using methods developed for larger dams can raise challenges. For example, the Graham (1999) approach to estimating potential loss of life (PLL) is generally applied when estimating the consequences of dam failure. However, Graham (1999) may not be the most suitable model for estimating PLL downstream of structures with relatively low heights and storage volumes (e.g. retarding basins), given the characteristics of the case histories used to develop the method.
In this paper six potential methods for estimating PLL are tested on four retarding basins in Melbourne. The methods are Graham (1999), the new Reclamation Consequence Estimating Methodology (RCEM), the UK risk assessment for reservoir safety (RARS) method, a spreadsheet application of HEC-FIA 3.0, and empirical methods developed by Jonkman (2007) and Jonkman et al. (2009). Results from the methods are compared, and comment is made about which is most suitable.
Keywords: potential loss of life, dam safety, risk analysis, retarding basins.
Now showing all 9 search results
-
$15.00
2015 Papers
2015 – Estimating potential loss of life downstream of retarding basins
Learn more -
$15.00
2015 Papers
2015 – Towards consistency in potential loss of life estimates: Testing the new Reclamation Consequence Estimating Methodology
Learn more -
$15.00
2015 Papers
2015 – Towards Risk-Based Surveillance Programmes – Maximising the Value of Your Monitoring Spend
Learn more -
$15.00
2016 Papers
2016 – Dam Safety Management for Upgrade of an Extreme Consequence Storage
Learn more -
$15.00
2016 Papers
2016 – The Use of a Safety Case to Demonstrate ALARP
Learn more -
$15.00
2020 Papers
2020 – The Safety Case
Learn more -
$15.00
2013 Papers
2013 – Development and application of a risk based approach to managing floods during construction
Learn more -
$15.00
2011 Papers
2011 – Toorourrong Reservoir – Small Dam, Big Problems
Learn more -
$15.00
2011 Papers
2011 – Investigating the Piping Risk Associated with Seepage at Monbulk Saddle Dam of Silvan Reservoir, Victoria
Learn more