Simon Lang, Chriselyn Meneses, Kelly Maslin, Mark Arnold

It is now common practice for dam owners in Australia to take a risk based approach to managing the safety of their large dams. Some dam owners are also using risk based approaches to manage other significant assets. For example, Melbourne Water manage the safety of their retarding basins in a manner similar to their water supply dams.
Assessing the risks posed by retarding basins using methods developed for larger dams can raise challenges. For example, the Graham (1999) approach to estimating potential loss of life (PLL) is generally applied when estimating the consequences of dam failure. However, Graham (1999) may not be the most suitable model for estimating PLL downstream of structures with relatively low heights and storage volumes (e.g. retarding basins), given the characteristics of the case histories used to develop the method.
In this paper six potential methods for estimating PLL are tested on four retarding basins in Melbourne. The methods are Graham (1999), the new Reclamation Consequence Estimating Methodology (RCEM), the UK risk assessment for reservoir safety (RARS) method, a spreadsheet application of HEC-FIA 3.0, and empirical methods developed by Jonkman (2007) and Jonkman et al. (2009). Results from the methods are compared, and comment is made about which is most suitable.
Keywords: potential loss of life, dam safety, risk analysis, retarding basins.

Now showing all 9 search results

  • $15.00
    2015  Papers

    2015 – Estimating potential loss of life downstream of retarding basins

    Learn more
    Learn more
  • $15.00
    2015  Papers

    2015 – Towards consistency in potential loss of life estimates: Testing the new Reclamation Consequence Estimating Methodology

    Learn more
    Learn more
  • $15.00
    2015  Papers

    2015 – Towards Risk-Based Surveillance Programmes – Maximising the Value of Your Monitoring Spend

    Learn more
    Learn more
  • $15.00
    2016  Papers

    2016 – Dam Safety Management for Upgrade of an Extreme Consequence Storage

    Learn more
    Learn more
  • $15.00
    2016  Papers

    2016 – The Use of a Safety Case to Demonstrate ALARP

    Learn more
    Learn more
  • $15.00
    2020  Papers

    2020 – The Safety Case

    Learn more
    Learn more
  • $15.00
    2013  Papers

    2013 – Development and application of a risk based approach to managing floods during construction

    Learn more
    Learn more
  • $15.00
    2011  Papers

    2011 – Toorourrong Reservoir – Small Dam, Big Problems

    Learn more
    Learn more
  • $15.00
    2011  Papers

    2011 – Investigating the Piping Risk Associated with Seepage at Monbulk Saddle Dam of Silvan Reservoir, Victoria

    Learn more
    Learn more