The Eildon Dam Improvement Project is being undertaken by Goulburn-Murray Water as part of its dam improvement program that includes an upgrade of the existing Lake Eildon spillway that passes through the left abutment of the dam. The main components of the spillway are a gated concrete gravity overflow section that is 33 m high and 60 m wide, a 435 m long low gradient spillway chute and a hydraulic jump stilling basin.
The spillway was originally designed, including a physical model, in the 1950s to pass a maximum discharge of 3,400 m3/s with a maximum reservoir head of 9.0 m above the spillway crest. This can be compared with the 2003 flood hydrology and flood routing studies that result in a PMF discharge of 6,900 m3/s and a maximum reservoir head of 14.1 m above the spillway crest.
A new physical hydraulic model study was carried out over 2003-2004 as part of the investigations by the Eildon Alliance for the Project. The model was tested with discharges up to and exceeding the upgraded PMF. Very turbulent conditions were observed at discharges exceeding the original design discharge including the formation, build-up and collapse of large diameter vortices in flow over the spillway crest and overflow section. The vortex phenomena resulted in the intermittent formation of high waves and very high transient pressure loadings at the downstream toe of the overflow section and extending to the upstream section of the spillway chute. The paper discusses some scaling issues, presents some of the salient results of the study and discusses their application to the 2003-2004 design of structural modifications for the spillway.
The paper includes a discussion and comparison of the 1950’s model study with the 2003-2004 study. The magnitude of the vortex phenomena could not be predicted from the previous studies, and it is recommended that investigations for upgrades of similar works that involve large increases in design discharges include detail examination of vortex phenomena.

Now showing all 8 search results

  • $15.00
    2004  Papers

    2004 – HYDRAULIC MODEL STUDY FOR EILDON DAM IMPROVEMENT PROJECT

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – Hydraulic Model Study For Eildon Dam Improvement Project

    Learn more
    Learn more
  • $15.00
    2015  Papers

    2015 – Efficient and cost-effective modelling and analysis of hydraulic structures using CFD

    Learn more
    Learn more
  • $15.00
    2017  Papers

    2017 – Construction Flood Risk Strategies for Dam Upgrades

    Learn more
    Learn more
  • $15.00
    2018  Papers

    2018 – Spillway stilling Basin Linings Design using Physical Hydraulic Modelling and DES CFD Modelling: Application of New Technologies

    Learn more
    Learn more
  • $15.00
    2013  Papers

    2013 – Case studies of foundation grouting using the GIN method at the enlarged Cotter Dam

    Learn more
    Learn more
  • $15.00
    2008  Papers

    2008 – Risk assessment in spillway remedial works design and construction and monitoring at Googong Dam

    Learn more
    Learn more
  • $15.00
    2010  Papers

    2010 – Googong Dam Spillway Upgrade – Construction Challenges and Alliance Framework

    Learn more
    Learn more