David Snape
Since the research and development work carried out by the (then) Metropolitan Water Sewerage and Drainage Board for the strengthening of Manly Dam in 1979/80, there has been over twenty years of continuous improvement in the application of advanced post-tensioned anchors for gravity dam rehabilitation.
Up until the Manly Dam remedial works, concerns had been increasing as to the long-term viability of available anchors. Sophisticated monitorable and restressable anchors, with superior corrosion protection afforded by greased and sheathed strands, were developed initially in test-bed conditions. This style of anchor has subsequently been used extensively throughout Australia on dam upgrades.
This paper compares the claims made by the designers with the demonstrated outcomes of installations that have been achieved, with particular emphasis on dams now owned by the Sydney Catchment Authority and Sydney Water Corporation. The original commitments to economy, aesthetics and rapidity of construction have been borne out by experience, with additional environmental advantages also being achieved. With the confidence built up from many successes in the strengthening of older dams, the time appears right to revisit the construction of new dams using the same style of post-tensioned anchors as the primary stabilising force.
Now showing all 2 search results
-
$15.00
2001 Papers
2001 – Sustainable Rehabilitation of Gravity Dams Using Post-Tensioned Anchors
Learn more
Learn more
David Snape
Since the research and development work carried out by the (then) Metropolitan Water Sewerage and Drainage Board for the strengthening of Manly Dam in 1979/80, there has been over twenty years of continuous improvement in the application of advanced post-tensioned anchors for gravity dam rehabilitation.
Up until the Manly Dam remedial works, concerns had been increasing as to the long-term viability of available anchors. Sophisticated monitorable and restressable anchors, with superior corrosion protection afforded by greased and sheathed strands, were developed initially in test-bed conditions. This style of anchor has subsequently been used extensively throughout Australia on dam upgrades.
This paper compares the claims made by the designers with the demonstrated outcomes of installations that have been achieved, with particular emphasis on dams now owned by the Sydney Catchment Authority and Sydney Water Corporation. The original commitments to economy, aesthetics and rapidity of construction have been borne out by experience, with additional environmental advantages also being achieved. With the confidence built up from many successes in the strengthening of older dams, the time appears right to revisit the construction of new dams using the same style of post-tensioned anchors as the primary stabilising force.
Learn more
-
$15.00
2014 Papers
2014 – Clyde Dam and Lake Dunstan; The First 21 Years
Learn more
Learn more
Peter F Foster and Peter K Silvester
Clyde Dam, the largest concrete gravity dam in New Zealand, was constructed in the 1980’s on the Clutha River in New Zealand. Lake Dunstan, which is the reservoir formed by the dam, reached its full operating level in 1993, some 21 years ago.
This paper summarises the performance of the dam over this period, the changes in operations that have been undertaken and looks to future challenges. The performance and management of the landslides around Lake Dunstan that were remediated prior to lake filling is outlined. The large floods experienced in the Clutha River in the 1990’s highlighted aspects of the flood management procedures that needed amending to capture lessons learned and some modifications to appurtenant structures have been completed. Changes to the environmental management in moving from water rights to consent conditions under the Resource Management Act are addressed.
Over the last 21 years a sediment delta has progressed down Lake Dunstan, as expected, and a long term sediment management plan has been developed for both Lake Dunstan and Lake Roxburgh which is downstream of Clyde Dam. A summary of the plan is discussed. The seismic hazard at the dam site is currently under study to update the seismic assessment parameters for the dam.
Learn more