2021 – A tale of two sites, siting optimal fish passage location at Ewen Maddock Dam $15.00 More info
2011 – Modelling Studies to Design and Assess Decommissioning Actions for a Seismically Unsafe, Concrete Arch Dam $15.00 More info
2010 – Construction for Destruction: Downriver Diversion Dam Modifications Required for Matilija Dam Decommissioning $15.00 More info
2009 – Design and Construction of Tallowa Dam Environmental Flow Release and Fish Passage Works $15.00 More info
2008 – Implementing upstream fish passage at an existing large dam: Hinze Dam trap and haul fishway $15.00 More info