David Murray
An essential criterion for any new dam project in Australia is to provide for passage of fish past the structure in both the upstream and downstream direction. In recent projects with a relatively high barrier this has been provided by mechanised systems such as locks, lifts or a combination of both.
A nature-like fishway provides for passage of fish past a barrier by applying some of the features of natural streams. The concept has been increasingly applied to fishway designs in North America and Europe. A nature-like fishway will provide variable flow depths, velocities and turbulence across its width and along its length and is constructed using natural materials to simulate the natural stream characteristics. The variable flow conditions coupled with the use of natural materials inherently result in different channel substrates that support the passage of a large range and size of fish species as well as other aquatic species. Where fish habitat has been depleted, a nature-like fishway can also supplement and enhance aquatic habitat.
The performance of nature-like fishways can be difficult to quantify due the very nature of the system. However, qualitative assessments in North America are indicating that a wide range of species are using such fishways and that fish species that were previously extirpated from rivers are again migrating.
The nature-like fishway concept has been applied to in-stream structures up to four metres high in the eastern states of Australia. However, the substantial progress made with this design in North America and Europe has not as yet been applied in this country.
This paper analyses the advantages and disadvantages of nature-like fishways over mechanised systems, such as locks and lifts, and makes an assessment of the suitability of the concept to dams in Australia with relatively high walls.
Now showing all 2 search results
-
$15.00
2010 Papers
2010 – Nature-like fishways – Are they suitable for Australian conditions?
Learn more
Learn more
David Murray
An essential criterion for any new dam project in Australia is to provide for passage of fish past the structure in both the upstream and downstream direction. In recent projects with a relatively high barrier this has been provided by mechanised systems such as locks, lifts or a combination of both.
A nature-like fishway provides for passage of fish past a barrier by applying some of the features of natural streams. The concept has been increasingly applied to fishway designs in North America and Europe. A nature-like fishway will provide variable flow depths, velocities and turbulence across its width and along its length and is constructed using natural materials to simulate the natural stream characteristics. The variable flow conditions coupled with the use of natural materials inherently result in different channel substrates that support the passage of a large range and size of fish species as well as other aquatic species. Where fish habitat has been depleted, a nature-like fishway can also supplement and enhance aquatic habitat.
The performance of nature-like fishways can be difficult to quantify due the very nature of the system. However, qualitative assessments in North America are indicating that a wide range of species are using such fishways and that fish species that were previously extirpated from rivers are again migrating.
The nature-like fishway concept has been applied to in-stream structures up to four metres high in the eastern states of Australia. However, the substantial progress made with this design in North America and Europe has not as yet been applied in this country.
This paper analyses the advantages and disadvantages of nature-like fishways over mechanised systems, such as locks and lifts, and makes an assessment of the suitability of the concept to dams in Australia with relatively high walls.
Learn more
-
$15.00
2010 Papers
2010 – Bowen River Weir Fishway – Design and Construction
Learn more
Learn more
David Scriven, Errol Beitz, Aaron Elphinstone
The Bowen River Weir is located at AMTD 94.4 km on the Bowen River, some 25 km south of Collinsville in North Queensland. The weir is part of the Bowen/Broken Rivers Water Supply Scheme and it provides a pumping pool for pipelines serving two nearby coal mining developments and a power station, and also acts as a regulator for riparian water users downstream until it meets the Burdekin River.
The weir was constructed in 1982 and incorporated a fishway towards the southern (left) bank, the design of which was based on the old “pool and weir” fish ladder type layout, typical of that era, with 48 separate cells containing partial vertical slots and baffles. This design has since been found to be ineffective for Australian native fish. In addition it was often out of service due to cells becoming filled with river sediment and debris. For these reasons it was decommissioned and made safe in late 2008 on the condition that a new fishway be constructed.
In late 2008 agreement was reached with Fisheries Queensland to install a “fish lock” type fishway at the site. This type of fishway has in recent years proved to be reliable and effective (eg. successful fish locks at Neville Hewitt and Claude Wharton Weirs). The preliminary and then final design was undertaken by SunWater (Infrastructure Development) between September 2008 and March 2009. The construction was undertaken by SunWater direct management, commencing in July 2009 and completed in late 2010.
Bowen River Weir Fishway – Design and Construction