Search Results: “” — Page 1

Project Aqua was planned to be a major hydropower development along the lower Waitaki Valley, New Zealand. Geotechnical investigations for the project were conducted in two main stages – from the late 1970’s to mid-1980’s, and again in the period from 2002 to 2004.
Community consultation was an important part of the 2002-2004 investigations, and was a key risk management issue for Meridian Energy. The proposed scope of the work included 512 drillholes and 734 test pits spread along the 60km project corridor. All proposed drillholes and test pits were subject to the Resource Management Act 1991 and needed Resource Consent applications, which required consultation with landowners, territorial authorities, and community and cultural groups including three Maori tribes.
A number of proposed investigations could not be undertaken because the landowner would not allow land access, but over 70% of the proposed work was completed with community support.

Now showing all 8 search results

  • $15.00
    2004  Papers

    2004 – THE IMPORTANCE OF COMMUNITY CONSULTATION IN GEOTECHNICAL INVESTIGATIONS FOR PROJECT AQUA

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2004 – The Importance of Community Consultation in Geotechnical Investigations for Project Aqua

    Learn more
    Learn more
  • $15.00
    2017  Papers

    2017 – Conditions Under Which Identified Faults Contribute Significantly to Seismic Hazard in Australia

    Learn more
    Learn more
  • $15.00
    2018  Papers

    2018 – Impacts of New Knowledge and the 2018 Draft ANCOLD Guidelines on Ground Motion Levels at Dam Sites in Australia

    Learn more
    Learn more
  • $15.00
    2018  Papers

    2018 – Potential Geologic Sources of Seismic Hazard in Australia’s South-Eastern Highlands: What Do We Know?

    Learn more
    Learn more
  • $15.00
    2019  Papers

    2019 – Performance and Management of the Cromwell Gorge Landslides, Clyde Dam Reservoir

    Learn more
    Learn more
  • $15.00
    2019  Papers

    2019 – Probabilistic Fault Displacement Hazard Analysis for Dams in Australia

    Learn more
    Learn more
  • $15.00
    2008  Papers

    2008 – Hinze Dam Stage 3 – development of the geological model and the implications for design

    Learn more
    Learn more