Nerida Bartlett, David Scriven, Peter Richardson
The failure of a number of consecutive wet seasons has resulted in storage levels in Eungella Dam being at dangerously low levels such that supply could be exhausted by June 2007. Eungella Dam supplies bulk water to the Bowen Basin coal fields as well as the Collinsville power station and the Collinsville township.
The Collinsville township, power station and coal mine as well as the Newlands mines take water from the Bowen River Weir which is supplied from Eungella Dam some 95 kilometres upstream. Transmission losses of the order of 25 to 50% have been experienced for releases from Eungella Dam to Bowen River Weir.
The Eungella Dam catchment area is 142 square kilometres. Significant flows occur in the Bowen River downstream of Eungella Dam, the catchment area above Bowen River Weir being 4,520 square kilometres. The topography in the surrounding area (near Collinsville) is not suitable for dam construction.
The opportunity existed for the construction of an offstream storage adjacent to the Bowen River Weir so that the downstream flows could be captured reducing the demand on Eungella Dam thus making more water available for upstream users.
A 5,200 ML offstream storage, associated pump station and rising main was designed, constructed and filled within a period of 12 months.
Foundations at the site are highly permeable sands. Marginally suitable clay for a seal was in short supply as was suitable rock for slope protection. A fixed price budget had been set by the contributing customers.
This paper describes the hydrology, site conditions, design and construction of the project.
Now showing all 3 search results
-
$15.00
2006 Papers
2006 – Design and Construction of the Gattonvale Offstream Storage
Learn more
Learn more
Nerida Bartlett, David Scriven, Peter Richardson
The failure of a number of consecutive wet seasons has resulted in storage levels in Eungella Dam being at dangerously low levels such that supply could be exhausted by June 2007. Eungella Dam supplies bulk water to the Bowen Basin coal fields as well as the Collinsville power station and the Collinsville township.
The Collinsville township, power station and coal mine as well as the Newlands mines take water from the Bowen River Weir which is supplied from Eungella Dam some 95 kilometres upstream. Transmission losses of the order of 25 to 50% have been experienced for releases from Eungella Dam to Bowen River Weir.
The Eungella Dam catchment area is 142 square kilometres. Significant flows occur in the Bowen River downstream of Eungella Dam, the catchment area above Bowen River Weir being 4,520 square kilometres. The topography in the surrounding area (near Collinsville) is not suitable for dam construction.
The opportunity existed for the construction of an offstream storage adjacent to the Bowen River Weir so that the downstream flows could be captured reducing the demand on Eungella Dam thus making more water available for upstream users.
A 5,200 ML offstream storage, associated pump station and rising main was designed, constructed and filled within a period of 12 months.
Foundations at the site are highly permeable sands. Marginally suitable clay for a seal was in short supply as was suitable rock for slope protection. A fixed price budget had been set by the contributing customers.
This paper describes the hydrology, site conditions, design and construction of the project.
Learn more
-
$15.00
2016 Papers
2016 – Paradise Dam – An Analysis of Severe Damage to a Modern Dam
Learn more
Learn more
David Scriven, Lawrence Fahey
Paradise Dam is located approximately 20 km north-west of Biggenden and 80 km south-west of Bundaberg on the Burnett River in Queensland. The dam was designed and constructed under an alliance agreement with construction completed in mid 2005. It is a concrete gravity structure up to 52 m high, the primary construction material being roller compacted concrete (RCC).
In January 2013 the flood of record was experienced at the dam with a depth of overflow on the primary spillway reaching 8.65 m following heavy rainfall in the catchment from ex-tropical cyclone Oswald. The peak outflow was approximately 17,000 m3/s. This equated to a 1 in 170 AEP flood event. When the flood receded it was discovered that the dam and surrounds had suffered severe damage in a number of locations including: extensive rock scour downstream of the primary dissipator and the left abutment, damage to portions of the primary dissipator apron, and the loss of most of the primary dissipator end sill.
SunWater initiated a staged remediation program to manage the dam safety risks and by November 2013 had completed the initial Phase 1 Emergency and Phase 2 Interim repairs. Phase 3 of the program was to implement a comprehensive Dam Safety Review (DSR) and a Comprehensive Risk Assessment (CRA). The DSR became arguably the largest ever undertaken by SunWater and included: extensive geotechnical investigations, large scale physical modelling, numerical scour analysis, stability analysis, and an extensive design assessment. This paper describes some of the key aspects of the DSR undertaken related to the flood damage.
Learn more
-
$15.00
2010 Papers
2010 – Bowen River Weir Fishway – Design and Construction
Learn more
Learn more
David Scriven, Errol Beitz, Aaron Elphinstone
The Bowen River Weir is located at AMTD 94.4 km on the Bowen River, some 25 km south of Collinsville in North Queensland. The weir is part of the Bowen/Broken Rivers Water Supply Scheme and it provides a pumping pool for pipelines serving two nearby coal mining developments and a power station, and also acts as a regulator for riparian water users downstream until it meets the Burdekin River.
The weir was constructed in 1982 and incorporated a fishway towards the southern (left) bank, the design of which was based on the old “pool and weir” fish ladder type layout, typical of that era, with 48 separate cells containing partial vertical slots and baffles. This design has since been found to be ineffective for Australian native fish. In addition it was often out of service due to cells becoming filled with river sediment and debris. For these reasons it was decommissioned and made safe in late 2008 on the condition that a new fishway be constructed.
In late 2008 agreement was reached with Fisheries Queensland to install a “fish lock” type fishway at the site. This type of fishway has in recent years proved to be reliable and effective (eg. successful fish locks at Neville Hewitt and Claude Wharton Weirs). The preliminary and then final design was undertaken by SunWater (Infrastructure Development) between September 2008 and March 2009. The construction was undertaken by SunWater direct management, commencing in July 2009 and completed in late 2010.
Bowen River Weir Fishway – Design and Construction
Learn more