Search Results: “” — Page 1
David S. Bowles, Andrew M. Parsons, Loren R. Anderson and Terry F. Glover
This paper summarises the Portfolio Risk Assessment (PRA) process that was implemented for SA Water’s 17 large dams, the information obtained from the PRA, and its use by SA Water. The PRA was designed to provide a baseline assessment of the existing dams and an initial prioritisation of future investigations and possible risk reduction measures. The PRA comprised a reconnaissance-level engineering assessment and risk assessment. These assessments were performed for floods, earthquakes, and static loading. Various structural and non-structural risk reduction measures were developed and evaluated. Information from the PRA can be used to provide inputs to capital budgeting, due diligence and liability evaluations, contingency planning and business criticality assessment, evaluation of loss financing and insurance programs, and a firm basis for monitoring and surveillance, operations and maintenance, and emergency preparedness planning.
Now showing 1–12 of 13 search results:
-
$15.00
1998 Papers
1998 – Portfolio Risk Assessment of SA Water’s Large Dams
Learn more -
$15.00
1999 Papers
1999 – Alamo Dam Demonstration Risk Assessment
Learn more -
$15.00
1999 Papers
1999 – Life-loss Estimation: What Can We Learn from Case Histories?
Learn more -
$15.00
2004 Papers
2004 – TRANSPORTATION MODEL FOR EVACUATION IN ESTIMATING DAM FAILURE LIFE LOSS
Learn more -
$15.00
2004 Papers
2004 – Transportation Model for Evacuation in Estimating Dam Failure Life Loss
Learn more -
$15.00
2005 Papers
2005 – Risk-Based Evaluation of Interim Operating Restrictions to Reduce the Risk of Earthquake Induced Dam Failure
Learn more -
$15.00
2005 Papers
2005 – RISK-BASED EVALUATION OF INTERIM OPERATING RESTRICTIONS TO REDUCE THE RISK OF EARTHQUAKE-INDUCED DAM FAILURE
Learn more -
$15.00
2006 Papers
2006 – From Portfolio Risk Assessment to Portfolio Risk Management
Learn more -
$15.00
2013 Papers
2013 – DAMRAE-U: A tool for including uncertainty in dam safety risk assessment
Learn more -
$15.00
2012 Papers
2012 – Baseline Risk Assessment for Herbert Hoover Dike
Learn more -
$15.00
2008 Papers
2008 – Risk assessment with uncertainty analysis for an already-initiated failure mode
Learn more -
$15.00
2009 Papers
2009 – Improvements to DAMRAE: A Tool for Dam Safety Risk Analysis Modelling
Learn more