Search Results: “” — Page 1
R.M. Dawson, A. Orange
Karapiro dam is the last in a line of hydro-electric dams on the Waikato River, in New Zealand’s North Island. Investigations identified a potential deficiency in parts of the dam under seismic loading. Detailed investigations and analysis narrowed the deficiency to a low strength clay seam under the concrete gravity left abutment structure. An innovative approach was taken to solving the stability problems at minimum cost, without lowering the storage lake, which would have had significant environmental and social impacts. The process of design and construction was overviewed by an international board of review.
Construction was completed in three main stages with further investigation and design refinement between. The main contract was completed over about eight months and included detailed concrete mix and pour schedule design to control stress development due to temperature gradients for the 2000 + cubic metres of mass concrete placed. While the extent of work was relatively small, the quality control, programming, and presence of a full reservoir throughout demanded a high degree of communication and co-operation between the Principal, Designer and Constructor. Despite some surprises during construction, the project was completed within budget and formed strong bonds between all those involved. This paper briefly describes the design process, and focuses on construction, from the point of view of the Owner, Constructor and the Designer.
Now showing 1–12 of 15 search results:
-
$15.00
2002 Papers
2002 – Karapiro Dam Stability Enhancement Project – Construction
Learn more -
$15.00
2003 Papers
2003 – BELLFIELD FLOOD SECURITY UPGRADE How we did it our way with minimal resources
Learn more -
$15.00
2017 Papers
2017 – The Hamata Tailings Dam Design and Construction at the Hidden Valley Mine in Papua New Guinea
Learn more -
$15.00
2018 Papers
2018 – Design Development and Construction of Cofferdam within HPP Scheme
Learn more -
$15.00
2019 Papers
2019 – The Lessons Learned and Construction Challenges for the Leslie Harrison Dam Upgrade
Learn more -
$15.00
2021 Papers
2021 – Don’t risk it to get the biscuit – Managing construction risk at Ewen
Learn more -
$15.00
2013 Papers
2013 – Challenges and lessons learnt from high-risk dam construction projects
Learn more -
$15.00
2013 Papers
2013 – Managing the risk of under-designed spillway training walls: an owner’s guide
Learn more -
$15.00
2013 Papers
2013 – Cotter Dam construction challenges and innovations
Learn more -
$15.00
2012 Papers
2012 – Enlarged Cotter Dam Diversion Gate Design – The Challenge and the Test
Learn more -
$15.00
2012 Papers
2012 – Innovation in the Design and Construction of the Enlarged Cotter Dam
Learn more -
$15.00
2008 Papers
2008 – Design and construction of a flood mitigation dam on the North Para River, using high-paste RCC
Learn more -
$15.00
2009 Papers
2009 – Lessons learnt on design, manufacture and placement of filter materials
Learn more -
$15.00
2009 Papers
2009 – Design and Construction of Tallowa Dam Environmental Flow Release and Fish Passage Works
Learn more