Search Results: “” — Page 1

R.M. Dawson, A. Orange

Karapiro dam is the last in a line of hydro-electric dams on the Waikato River, in New Zealand’s North Island. Investigations identified a potential deficiency in parts of the dam under seismic loading. Detailed investigations and analysis narrowed the deficiency to a low strength clay seam under the concrete gravity left abutment structure. An innovative approach was taken to solving the stability problems at minimum cost, without lowering the storage lake, which would have had significant environmental and social impacts. The process of design and construction was overviewed by an international board of review.

Construction was completed in three main stages with further investigation and design refinement between. The main contract was completed over about eight months and included detailed concrete mix and pour schedule design to control stress development due to temperature gradients for the 2000 + cubic metres of mass concrete placed. While the extent of work was relatively small, the quality control, programming, and presence of a full reservoir throughout demanded a high degree of communication and co-operation between the Principal, Designer and Constructor. Despite some surprises during construction, the project was completed within budget and formed strong bonds between all those involved. This paper briefly describes the design process, and focuses on construction, from the point of view of the Owner, Constructor and the Designer.

Now showing 1–12 of 15 search results:

  • $15.00
    2002  Papers

    2002 – Karapiro Dam Stability Enhancement Project – Construction

    Learn more
    Learn more
  • $15.00
    2003  Papers

    2003 – BELLFIELD FLOOD SECURITY UPGRADE How we did it our way with minimal resources

    Learn more
    Learn more
  • $15.00
    2017  Papers

    2017 – Construction Flood Risk Strategies for Dam Upgrades

    Learn more
    Learn more
  • $15.00
    2017  Papers

    2017 – The Hamata Tailings Dam Design and Construction at the Hidden Valley Mine in Papua New Guinea

    Learn more
    Learn more
  • $15.00
    2018  Papers

    2018 – Design Development and Construction of Cofferdam within HPP Scheme

    Learn more
    Learn more
  • $15.00
    2019  Papers

    2019 – The Lessons Learned and Construction Challenges for the Leslie Harrison Dam Upgrade

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Don’t risk it to get the biscuit – Managing construction risk at Ewen

    Learn more
    Learn more
  • $15.00
    2013  Papers

    2013 – Challenges and lessons learnt from high-risk dam construction projects

    Learn more
    Learn more
  • $15.00
    2013  Papers

    2013 – Managing the risk of under-designed spillway training walls: an owner’s guide

    Learn more
    Learn more
  • $15.00
    2013  Papers

    2013 – Cotter Dam construction challenges and innovations

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Enlarged Cotter Dam Diversion Gate Design – The Challenge and the Test

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Innovation in the Design and Construction of the Enlarged Cotter Dam

    Learn more
    Learn more
  • $15.00
    2008  Papers

    2008 – Design and construction of a flood mitigation dam on the North Para River, using high-paste RCC

    Learn more
    Learn more
  • $15.00
    2009  Papers

    2009 – Lessons learnt on design, manufacture and placement of filter materials

    Learn more
    Learn more
  • $15.00
    2009  Papers

    2009 – Design and Construction of Tallowa Dam Environmental Flow Release and Fish Passage Works

    Learn more
    Learn more