Leslie Harrison Dam is located on Tingalpa Creek in the Redlands region, approximately 18 km southeast of Brisbane. It is classified as an extreme hazard category dam with a large population at risk only a short distance downstream.
The dam comprises a 25 m high zoned earthfill embankment, with a dry well concrete intake tower and an outlet conduit located at the base of the dam near the old river channel. The spillway has a 43 m wide concrete gravity ogee crest, with a concrete lined chute terminating in an energy dissipator structure.
Seqwater is undertaking a staged upgrade of Leslie Harrison Dam to address deficiencies identified during the Portfolio Risk Assessment (URS 2013) and Geotechnical Investigations (GHD 2016).
While the dam has met the water supply needs of the community for the past 50 years, the upgrade ensures local residents will be well served into the future. Additionally, the structure will meet the most up to date requirements of dam safety management and national industry standards.
Construction of the Stage 1 upgrade commenced in June 2018 and involved the removal and replacement of liquefiable material in the foundation, modernisation and extension of the outlet works, addition of a new downstream filter buttress to the embankment, and lastly, the installation of both active and passive anchors within the spillway ogee and lower chute floor.
As with any major project, the works involved a number of challenges that had to be addressed. This paper provides an insight into the key challenges encountered and how these were overcome by the design and construction teams using practical engineered solutions. The intent is to provide the reader with an account of the “lessons learned” during the construction phase, along with recommendations for future dam upgrades.
Now showing all 2 search results
-
$15.00
2019 Papers
2019 – The Lessons Learned and Construction Challenges for the Leslie Harrison Dam Upgrade
Learn more
Learn more
Ryan Cantrill, Peyman Andaroodi, Colin Thompson
Leslie Harrison Dam is located on Tingalpa Creek in the Redlands region, approximately 18 km southeast of Brisbane. It is classified as an extreme hazard category dam with a large population at risk only a short distance downstream.
The dam comprises a 25 m high zoned earthfill embankment, with a dry well concrete intake tower and an outlet conduit located at the base of the dam near the old river channel. The spillway has a 43 m wide concrete gravity ogee crest, with a concrete lined chute terminating in an energy dissipator structure.
Seqwater is undertaking a staged upgrade of Leslie Harrison Dam to address deficiencies identified during the Portfolio Risk Assessment (URS 2013) and Geotechnical Investigations (GHD 2016).
While the dam has met the water supply needs of the community for the past 50 years, the upgrade ensures local residents will be well served into the future. Additionally, the structure will meet the most up to date requirements of dam safety management and national industry standards.
Construction of the Stage 1 upgrade commenced in June 2018 and involved the removal and replacement of liquefiable material in the foundation, modernisation and extension of the outlet works, addition of a new downstream filter buttress to the embankment, and lastly, the installation of both active and passive anchors within the spillway ogee and lower chute floor.
As with any major project, the works involved a number of challenges that had to be addressed. This paper provides an insight into the key challenges encountered and how these were overcome by the design and construction teams using practical engineered solutions. The intent is to provide the reader with an account of the “lessons learned” during the construction phase, along with recommendations for future dam upgrades.
Learn more
-
$15.00
2013 Papers
2013 – Maroon Dam: A multi-analytical approach for a multi-purpose dam
Learn more
Learn more
Iain Lonie, Malcolm Barker and Colin Thompson
Consideration of flood mitigation benefits, water supply, irrigation and recreational usage played an instrumental role in developing the proposed upgrade for Maroon Dam to meet dam safety and flood capacity requirements. Maroon Dam is a 47.4 m high zoned earthfill dam completed in 1974. The dam is a multi-purpose reservoir which is now owned and operated by Seqwater and plays an important role in the local community. Key drivers for the proposed upgrade design included embankment stability, foundation concerns, piping, spillway capacity and erosion of the embankment toe.
Six options were reduced to three through a high level screening exercise. A more detailed assessment of the remaining options was undertaken using a Multi Criteria Analysis and a detailed risk assessment. Consideration of the competing uses of the reservoir was critical in the development and assessment of the preferred option. This paper will present the details of the analytical methods used as input for the Multi Criteria Analysis and the detailed risk assessment for the final proposed design option that will meet the requirements of dam safety and flood capacity without impacting on water supply, irrigation and recreational usage.