Bob Wark, Colin Bradbury, Michael Somerford and Michelle Rhodes

The Harvey Dam project is a major component of the Water Corporation’s Stirling-Harvey Redevelopment Scheme, which was developed to provide potable water to Perth. The scheme will deliver 34 GL/annum or about 10% of Perth’s supply. The project timetable was tight. The decision to proceed with the scheme, made in June 1998, required Harvey Dam to be ready to impound water by June 2002.

Construction of the Harvey Dam was complicated by the following:

  • The tight project timeline;
  • The dam is located about 1.6km upstream of Harvey townsite and its population of 3000 people;
  • Strict environmental constraints applied to construction noise, dust, blast vibrations and construction traffic;
  • Variable ground conditions required flexibility within the contract in both the extent and type of ground treatment required;
  • The need to maintain irrigation supplies throughout the construction period, from the existing aged Harvey Weir, which was located immediately upstream of the proposed dam; and
  • The need to safely discharge floods at all stages of dam construction.

These and other issues required the development of risk management strategies for the project. The construction risks were allocated within the contract to provide for an equitable sharing of risk between the Contractor and the Principal. The paper describes the development and implementation of the risk management strategies and what lessons have been learnt from the process.

Now showing 1–12 of 13 search results:

  • $15.00
    2002  Papers

    2002 – Harvey Dam Project- Risk Management Strategies

    Learn more
    Learn more
  • $15.00
    2016  Papers

    2016 – Damage to the Fairbairn Dam Spillway and Subsequent Analyses and Design of the Remedial Works

    Learn more
    Learn more
  • $15.00
    2016  Papers

    2016 – Probabilistic Slope Failure Risk Estimation of a Dam with Zones of Weak Foundation Material

    Learn more
    Learn more
  • $15.00
    2018  Papers

    2018 – Dynamic analysis and design of stilling basin slabs at Fairbairn Dam

    Learn more
    Learn more
  • $15.00
    2018  Papers

    2018 – Refurbishment of the 120 year old inlet tower on Mundaring Weir

    Learn more
    Learn more
  • $15.00
    2019  Papers

    2019 – Design of Rockfill Embankments for Overtopping During Construction

    Learn more
    Learn more
  • $15.00
    2007  Papers

    2007 – Calculating spillway crest pressures for high-head operation

    Learn more
    Learn more
  • $15.00
    2009  Papers

    2009 – Today’s Capital, Tomorrow’s Consequences; Assessing Future Failure Costs

    Learn more
    Learn more
  • $15.00
    2009  Papers

    2009 – Stirling Dam – Conservation of Water during Remedial Works

    Learn more
    Learn more
  • $15.00
    2009  Papers

    2009 – Post Tension Grout Corrosion Investigation

    Learn more
    Learn more
  • $15.00
    2009  Papers

    2009 – Lessons learnt on design, manufacture and placement of filter materials

    Learn more
    Learn more
  • $15.00
    2011  Papers

    2011 – Horror Stories with Outlet Works

    Learn more
    Learn more
  • $15.00
    2011  Papers

    2011 – Searching for Solutions to ASR

    Learn more
    Learn more