Search Results: “” — Page 1

Stephen Newman

In recent years the option to decommission water supply dams has had renewed focus due to a number of drivers. These include the increased costs of upgrading aging infrastructure against their provided value, climate change reducing the effectiveness of some dams as a reliable water source, greater value placed on environmental outcomes and changing demands for the water including power in case of Hydropower dams. In addition the recent construction of large coastal desalination plants as an alternate water source for large urban areas, particularly in Australia, has reduced the need for some dam assets.

In response to this changing dynamic in the Industry, ICOLD formed a technical committee in 2007 to prepare a bulletin on dam decommissioning for use by those considering the option of decommissioning a dam. The purpose of the bulletin or guideline was not as a design manual but to provide industry with information and guidance to better understand the key drivers of decommissioning and the issues around decommissioning. It is probably a fair summation of the practice to date, that issues associated with decommissioning of major dams have not always been well understood prior to this option being selected. This has on occasion resulted in dramatic increases in the cost of decommissioning, extended timelines and not least, strong community and other stakeholder resistance. Hence the ICOLD decision to prepare a bulletin. The Author of this paper was a part of this committee and has also been involved with a number of dam decommissionings and assisting regulators in developing their own guidelines.

In this paper the key findings from development of the ICOLD bulletin will be presented including illustration of various key issues via case studies from this region and internationally. In particular, the true cost of decommissioning. The final draft of bulletin is currently under review.
Keywords: Decommissioning, ICOLD, community, stakeholder, water supply, hydropower, cost.

Now showing 1–12 of 40 search results:

  • $15.00
    2012  Papers

    2012 – Decommissioning of Water Supply Dams – Worldwide State of Knowledge

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – 15 Years of Experience with a Dam Improvement Program

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – The Provision of Engineering Advice for the Emergency Management of the Nathalia Floods, March 2012

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – North Pine Dam – January 2011 Flood of Record Lessons Learned

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – The QCC Process in USACE Risk-Informed Decisions

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Gördes Dam – A Turkish Delight

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Interface-Element Evaluations of A Concrete-Rockfill Composite Dam Using Centrifuge Model Test and Numerical Analyses

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Logue Brook Dam Outlet Works Upgrade

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Using Submerged Weirs to Prevent Cold Water Pollution from Reservoirs Fort Peck Dam Case Study

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Piano Key Weir: An Innovative Spillway Upgrade Solution

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Rock Erosion Experiences in the Wivenhoe Dam Spillway

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Backward Erosion Piping: What are the chances of that?

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Estimating Individual Risk

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Modernisation of the Glenelg Gates Structure within a Residential Area to meet Operational and Dam Safety Criteria

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Assessment of Liquefaction-induced Deformation of Tailings Dams using Effective Stress Analysis Approach

    Learn more
    Learn more
  • $15.00
    2012  Papers

    2012 – Enlarged Cotter Dam Diversion Gate Design – The Challenge and the Test

    Learn more
    Learn more
{"cart_token":"","hash":"","cart_data":""}