Search Results: “” — Page 1

David J. Walland, Jeanette Meighen, Catherine Beesley, Karin Xuereb

The method for estimating Probable Maximum Precipitation in areas of Australia affected by tropical storms has been revised. The method that it replaces, designed in the 1970s is considered outdated and based on limited data.

The entire Bureau rainfall record has been examined objectively for the largest rainfall events. These events have been analysed and modified to enable storm transposition across a large region. The modifications are based on local topography, moisture and location. Once the storm data is transposed to a single location it can be meaningfully compared and used to construct an upper estimate on the possible rainfall. This estimate can then be used in conjunction with information about a specific catchment in order to estimate Probable Maximum Precipitation at that location.

Now showing 1–12 of 31 search results:

  • $15.00
    2002  Papers

    2002 – A New Method for Estimating Probable Maximum Precipitation in Tropical Australia

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Assessing The Likelihood Of Concentrated Leaks Leading To Failure In Concrete Faced Rockfill Dams

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Awoonga Alliance – Awoonga Dam Raising Stage 1

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Catagunya Dam – Corrosion Assessment of Fully Grouted Post-Tensioned Anchors

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Dartmouth Regulating Dam – Increasing the Full Supply Level

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Environmental Flows-The South Australian Water Corporation Perspective

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Experimental Investigation of the Rate of Piping Erosion of Soils in Embankment Dams

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Harvey Dam Project- Risk Management Strategies

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Implications of Cold Water Releases for Freshwater Fish Populations

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Interim Raising of Main Creek Tailings Dam by Upstream Construction

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Inundation Risk Reduction Adjacent to Awoonga Dam

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Karapiro Dam Stability Enhancement Project – Construction

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Lake Daylesford Dam: Safety Review Following Overtopping

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Managing Uncertainty in a Dam Environment

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Meeting Modern Seismic Criteria Using The Time-History Method of Analysis For An Existing Dam

    Learn more
    Learn more
  • $15.00
    2002  Papers

    2002 – Meeting Referable Dam and Water Management Requirements of the Queensland Water Act – A ‘How To’ Guide

    Learn more
    Learn more