P.H. Allen

The regulatory environment for dams in Queensland will change when the new provisions of the Water Act 2000 are proclaimed in late 2001 or early 2002. The definition of a ‘referable dam’ has shifted from a simple height and storage criteria to one that requires a population at risk (PAR) before dams are considered referable. Additionally hazardous waste dams such as tailings dams will no longer be considered as referable dams and under the Act regulatory control will be transferred to the Environmental Protection Agency.

Referable water dams will be assigned a Failure Impact Category of 2 if they have a PAR greater than 100 and a Category of I if they have a PAR greater than or equal to 2 and less than 100. This has required the development of guidelines for the assessment of ‘population at risk’. These guidelines have been written to suit a wide variety of dam impact situations and a range of dam owner resources. The guidelines require certification of the failure impact assessment by a Registered Professional Engineer in the state of Queensland.

The Queensland Dam Safety Management Guidelines have also been re-written to make them more amenable for reference in dam safety conditions.

New dams will require development permits to be issued under the Integrated Planning Act and will have development permit conditions applied in accordance with their Failure Impact Category. There is a range of transitional provisions for existing dams.

This paper covers all of the above issues as well as providing an indication as to how these statutory guidelines relate to the various ANCOLD guidelines.

Now showing 1–12 of 26 search results:

  • $15.00
    2001  Papers

    2001 – A New Regulatory Environment for Dams in Queensland

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Are Your Gates Up to Scratch or Down the Creek?

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Benchmarking Deformation Surveys of Hydraulic Structures Against International Practice

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Cadiangullong RCC Dam: Monitored Performance versus Design Expectations

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Coliban Water Dam Improvement Projects – The Decommissioning Option

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Criteria for Developing Seismic Loads for the Safety Evaluation of Dams of Two New Zealand Owners

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Estimation of the Probability of Failure Embankment Dams by Internal Erosion and Piping Using Event Tree Method

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Financial and Economic Consequence Assessment – Is the Methodology Important?

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Flood Passing Capacity Upgrade Considerations for Wivenhoe Dam

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Greenhouse Gas Emissions from Reservoirs — Is Australian Hydropower Environmentally Friendly?

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Holistic Environmental Impact Assessment of Dams Projects

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Large Dams and Recommended Practices – An Asian Development Bank Study

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Management of the TrustPower Ltd Dam Portfolio

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – On the Art of Event Tree Modelling for Portfolio Risk Analyses

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Planning for Existing Hydro Generation Facilities Under the Resource Management Act 1991 – The Contact Energy Experience

    Learn more
    Learn more
  • $15.00
    2001  Papers

    2001 – Refurbishment of Diversion Gate No 2 Roxburgh Dam New Zealand

    Learn more
    Learn more