Search Results: “” — Page 2

David S. Bowles, Andrew M. Parsons, Loren R. Anderson and Terry F. Glover

This paper summarises the Portfolio Risk Assessment (PRA) process that was implemented for SA Water’s 17 large dams, the information obtained from the PRA, and its use by SA Water. The PRA was designed to provide a baseline assessment of the existing dams and an initial prioritisation of future investigations and possible risk reduction measures. The PRA comprised a reconnaissance-level engineering assessment and risk assessment. These assessments were performed for floods, earthquakes, and static loading. Various structural and non-structural risk reduction measures were developed and evaluated. Information from the PRA can be used to provide inputs to capital budgeting, due diligence and liability evaluations, contingency planning and business criticality assessment, evaluation of loss financing and insurance programs, and a firm basis for monitoring and surveillance, operations and maintenance, and emergency preparedness planning.

Now showing 13–24 of 30 search results:

  • $15.00
    1998  Papers

    1998 – Portfolio Risk Assessment of SA Water’s Large Dams

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – Remedial Works for Seepage and AAR Control by Using Watertight Geomembranes

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – Repair of Two Dams Suffering Leakage – Two Case Studies

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – Results from The Earthquake Preparation, Alarm and Response System for Sydney Water Corporation, 1992 to 1998

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – Risk Assessment – Estimating the Probability of Failure Embankment Dams by Piping

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – Risk Assessment for Hume Dam – Lessons from Estimating the Chance of Failure

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – Risk Assessment of Dams – Future Directions for Victoria

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – Risk Based Approach to Wartook Reservoir Rehabilitation

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – Safety Assessment of Corin Dam

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – Safety of Meadowbank Dam Against Sliding Parameter Uncertainty

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – The Emerging River Murray Water Business – Developing Asset and Risk Management in an Inter-Government Context

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – The Olary Floods February 1997 Implications for South Australia

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – Thermal Stress Modelling, High Sand RCC Mixes and In-Situ Modification of RCC Used for Construction of the Cadiangullong Dam NSW

    Learn more
    Learn more
  • $15.00
    1998  Papers

    1998 – WAC Bennett Dam – The Sinkhole Crisis

    Learn more
    Learn more
{"cart_token":"","hash":"","cart_data":""}