Anna Hams, Lindsay Millard, Elizabeth Jackson, Zara Bostock, Helena Sutherland

The Queensland dam regulator requires that dam safety risk during construction must not increase from its existing profile. The Stage 2A upgrade of Ewen Maddock Dam required excavation of its homogeneous embankment to retrofit chimney and filter blankets, and also the construction of a concrete parapet wall. Due to the constraints of the embankment profile and a constricted site, it was necessary to excavate the downstream face of the embankment. This excavation increased the risk of embankment failure due to overtopping, piping and instability. This paper discusses the measures taken to manage those dam safety risks, and includes:

● use of a temporary system consisting of six large siphons to regulate the lake level to a Restricted Full Supply Level (Restricted FSL). This encompassed the optimisation of lake level and capacity of siphons required to balance competing risks; dam safety, environmental, community and water security. This optimisation was based on a probabilistic assessment of hydrological inflows and lake levels, the development of a flow management plan;

● implementation of a Dam Safety Management Plan which outlined the roles and responsibilities for
managing dam safety during construction at each pre-determined lake level trigger levels. This includes how the contractor was involved to ensure quick response from the “eyes and ears on the ground”; and,

● development of recommended construction methodologies including a “rolling front” and placing
filters vertically to increase production, maintain quality and limit the extent of embankment excavation underway.

Now showing 13–24 of 37 search results:

  • $15.00
    2021  Papers

    2021 – Ewen Maddock Dam Upgrade – Draining down the risk (with siphons)

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Flood Modelling of Cooma Water Storage Tank Failure

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Ground shaking potential relating to eastern Australian active faults, an example of the Bendigo Region with relevance to water reservoirs and tailings dams

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Holistic tailings management and governance

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Importance of adequate characterisation of fissured clay in dam foundations, a case study

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Improving Survey Monitoring Techniques – Real-Time Monitoring Systems

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Lessons learnt from the application of HEC-LifeSim 2.0 to multiple dams across Australia

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Maintaining and increasing efficiency in reservoirs – geomembranes and floating photovoltaic panels

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Managing multiple concurrences estimating likelihood and consequence in dam break application, Rainfall based data sparse regions

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Mundaring Weir, Stilling Basin and Outlet Works Risk Assessment

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Paradise Dam and its present and future impact on dam projects

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Poster Paper – Aspects considered in the selection of individual risk tolerability threshold for referable dams in Queensland

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Quantifying the minimum epistemic uncertainty required PSHA input models

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Recommended skills for dam safety management personnel

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Regulatory risk – a proposed framework for contractual accountability of the Crown of regulatory changes

    Learn more
    Learn more
  • $15.00
    2021  Papers

    2021 – Remedial Works To Lock and Weir One – It seemed like a good idea in the design office