Search Results: “” — Page 1

Martin Pinkham, Robin Dawson, John Grimston

Resource consents for Christchurch’s existing solid waste disposal facility at Burwood expire in May 2005 and the landfill must close. A new, state-of-the-art regional landfill is under construction at Kate Valley, which will accept solid waste from Christchurch and surrounding districts. Investigations and studies for the landfill have attracted considerable public attention, engaging public groups in discussions through resource consent hearings in 2002 and 2003.

The proposed landfill includes two embankment dams in a cascade arrangement below the landfill. The first is a 19m high sedimentation dam designed to retain silt runoff from the earthworks associated with landfill construction and operation, protecting the health of the stream and environment below the dam. The second is a 9m high dam performing dual roles of storing and supplying water for the landfill earthworks activities, and providing an additional safety buffer for silt control and containment of any accidental release of leachate at the landfill.

While the dams are relatively modest in size, they are being built to very high standards with strict peer review as a result of their association with the landfill project, and to minimise any community and environmental impacts. The design and construction of the landfill and dams is being completed using an innovative modified alliancing arrangement which provides the close working relationship that alliances are renowned for, while minimising up-front financial risk to the owner.

This paper deals with key aspects related to the landfill dams, such as community consultation and expectations, environmental impacts as well as the technical features. Construction is underway for the dams and the landfill at the time of writing of this paper.

Now showing 1–12 of 64 search results:

  • $15.00
    2005  Papers

    2004 – Canterbury Regional Landfill Water Supply and Sedimentation Dams

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2004 – Communicating Dam Safety Practices to the Community for a 60km Long Canal Hydro Development in New Zealand

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2004 – The Importance of Community Consultation in Geotechnical Investigations for Project Aqua

    Learn more
    Learn more
  • 2005  Papers

    2004 – Wai-Iti Valley Community Water Supply Augmentation Project

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – A Contribution to Public Safety Studies – Failure Modes and Likelihood Analysis for a Tephra Dam on an Active Volcano

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – Achieving Benefits from Instrumentation and Survey Measurements of Dam Behaviour

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – ASSESSMENT CRITERIA FOR EMBANKMENT DAMS AND THE ROLE OF NUMERICAL MODELS

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – Assessment Criteria for Embankment Dams and the Role of Numerical Models

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – Bellfield Outlet Tower – How to do interesting things in tight spaces

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – Blowering Dam – Spillway Hydraulic Modelling

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – BLOWERING DAM – SPILLWAY HYDRAULIC MODELLING

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – Characterisation of the Ross River Dam Foundations

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – COMMUNITY PARTNERSHIP AND THE DELIVERY OF A MAJOR LEGACY

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – Community Partnership and the Delivery of a Major Legacy

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – Dam design, Geotechnical Parameters, Numerical Codes, Hydraulic Fracturing, Seismic Analysis.

    Learn more
    Learn more
  • $15.00
    2005  Papers

    2005 – Dam Safety Emergency Exercise for Eildon Dam, Goulburn Weir and Waranga Basin

    Learn more
    Learn more