Search Results: “” — Page 1

Under the Snowy Water Licence and as a result of the Snowy Water Inquiry, Snowy Hydro Limited
(SHL) is required to release environmental flows into the lower Snowy River below Jindabyne Dam at lake levels as low as the minimum operating level (MOL). The construction of new outlet works is necessary to meet this requirement. The other issue driving the project is the limited spillway capacity. A new spillway is required to pass the design flood recommended in the guidelines of the NSW Dam Safety Committee. The design of the outlet works and new spillway has been completed and a contract to construct the works has been let and construction has commenced. This paper summarises the process used to develop the selected design arrangement. It includes discussion on the design of modifications to the existing spillway and the part played by the hydraulic model study in that design and discussion on the auxiliary spillway design and the design of the outlet works to pass a peak flow of 58 m3/s.

Now showing 1–12 of 59 search results:

  • $15.00
    2004  Papers

    2004 – 3 Jindabyne Dam Spillway Upgrade and Outlet Works

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – Adaptive Management of Desilting Operations for River Health Outcomes – a Case Study

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – Adaptive Management of Desilting Operations for River Health Outcomes – a Case Study

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – BORUMBA DAM REMEDIAL WORKS AND SUCCESSFUL RELOCATION OF FISH AND TURTLES

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – Borumba Dam Remedial Works and Successful Relocation of Fish and Turtles

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – BURNETT RCC DAM DESIGN – AN INNOVATIVE APPROACH TO SITE SPECIFIC CONDITIONS

    Learn more
    Learn more
  • 2004  Papers

    2004 – Burnett RCC Dam Design – An Innovative Approach to Site Specific Conditions

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – CANTERBURY REGIONAL LANDFILL WATER SUPPLY AND SEDIMENTATION DAMS

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – CLARE WEIR FISHWAY UPGRADE

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – Clare Weir Fishway Upgrade

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – CLOSURE AND DECOMMISSIONING OF THE NAMUK TAILINGS DAM, EAST KALIMANTAN

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – Closure and Decommissioning of the Namuk Tailings Dam, East Kalimantan

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – Communicating Dam Safety Practices to the Community for a 60km Long Canal Hydro Development in New Zealand

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – Community Consultation – Value Adding And Invaluable

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – COMMUNITY CONSULTATION – VALUE ADDING AND INVALUABLE

    Learn more
    Learn more
  • $15.00
    2004  Papers

    2004 – Cosseys Dam – Update solutions that meet owner, operator, environmental and community expectations

    Learn more
    Learn more