Search Results: “” — Page 2
David S. Bowles, Andrew M. Parsons, Loren R. Anderson and Terry F. Glover
This paper summarises the Portfolio Risk Assessment (PRA) process that was implemented for SA Water’s 17 large dams, the information obtained from the PRA, and its use by SA Water. The PRA was designed to provide a baseline assessment of the existing dams and an initial prioritisation of future investigations and possible risk reduction measures. The PRA comprised a reconnaissance-level engineering assessment and risk assessment. These assessments were performed for floods, earthquakes, and static loading. Various structural and non-structural risk reduction measures were developed and evaluated. Information from the PRA can be used to provide inputs to capital budgeting, due diligence and liability evaluations, contingency planning and business criticality assessment, evaluation of loss financing and insurance programs, and a firm basis for monitoring and surveillance, operations and maintenance, and emergency preparedness planning.
Now showing 13–24 of 31 search results:
-
$15.00
1998 Papers
1998 – Portfolio Risk Assessment of SA Water’s Large Dams
Learn more -
$15.00
1998 Papers
1998 – Remedial Works for Seepage and AAR Control by Using Watertight Geomembranes
Learn more -
$15.00
1998 Papers
1998 – Repair of Two Dams Suffering Leakage – Two Case Studies
Learn more -
$15.00
1998 Papers
1998 – Results from The Earthquake Preparation, Alarm and Response System for Sydney Water Corporation, 1992 to 1998
Learn more -
$15.00
1998 Papers
1998 – Risk Assessment – Estimating the Probability of Failure Embankment Dams by Piping
Learn more -
$15.00
1998 Papers
1998 – Risk Assessment for Hume Dam – Lessons from Estimating the Chance of Failure
Learn more -
$15.00
1998 Papers
1998 – Risk Assessment of Dams – Future Directions for Victoria
Learn more -
$15.00
1998 Papers
1998 – Risk Based Approach to Wartook Reservoir Rehabilitation
Learn more -
$15.00
1998 Papers
1998 – Safety Assessment of Corin Dam
Learn more -
$15.00
1998 Papers
1998 – Safety of Meadowbank Dam Against Sliding Parameter Uncertainty
Learn more -
$15.00
1998 Papers
1998 – The Emerging River Murray Water Business – Developing Asset and Risk Management in an Inter-Government Context
Learn more -
$15.00
1998 Papers
1998 – The Olary Floods February 1997 Implications for South Australia
Learn more -
$15.00
1998 Papers
1998 – Thermal Stress Modelling, High Sand RCC Mixes and In-Situ Modification of RCC Used for Construction of the Cadiangullong Dam NSW
Learn more -
$15.00
1998 Papers
1998 – WAC Bennett Dam – The Sinkhole Crisis
Learn more -
$15.00
1998 Papers
1998 – Risk Assessment of Dams – Future Directions for Victoria
Learn more
- 1
- 2