2015 – The Challenges Dam Owners Face When Considering Engineering Repairs in a Commercial Climate

Sarah McComber, Peyman Bozorgmehr

Boondooma Dam is a concrete-faced rockfill dam with an unlined, uncontrolled spillway chute. Construction was scheduled for completion in 1983; however a spill event occurred during the last stage.of construction Following this spill event an Erosion Control Structure (ECS) was built across the spillway chute to help mitigate any future scouring.
The spillway performed as expected during minor spill events in the 1990s and early 2000s. During the significant rainfall event of 2010/11, significant scour occurred to the spillway chute and downstream of the ECS, as a result of the spillway operation.
Following the 2010/11 flood, emergency repairs were made and long term repair solutions were investigated. However, during Tropical Cyclone Oswald in January 2013, the dam experienced the flood of record, and further scour occurred in the spillway chute.
The long term repair solution was reviewed in light of the 2013 damage. A solution is required that would satisfy the engineering problem and prevent further damage, while satisfying the commercial considerations faced by dam owners, insurers, customers and downstream stakeholders.
Keywords: Boondooma Dam, flood damage, scour damage, commercial engineering solutions.