2015 – Estimating potential loss of life downstream of retarding basins

Simon Lang, Chriselyn Meneses, Kelly Maslin, Mark Arnold

It is now common practice for dam owners in Australia to take a risk based approach to managing the safety of their large dams. Some dam owners are also using risk based approaches to manage other significant assets. For example, Melbourne Water manage the safety of their retarding basins in a manner similar to their water supply dams.
Assessing the risks posed by retarding basins using methods developed for larger dams can raise challenges. For example, the Graham (1999) approach to estimating potential loss of life (PLL) is generally applied when estimating the consequences of dam failure. However, Graham (1999) may not be the most suitable model for estimating PLL downstream of structures with relatively low heights and storage volumes (e.g. retarding basins), given the characteristics of the case histories used to develop the method.
In this paper six potential methods for estimating PLL are tested on four retarding basins in Melbourne. The methods are Graham (1999), the new Reclamation Consequence Estimating Methodology (RCEM), the UK risk assessment for reservoir safety (RARS) method, a spreadsheet application of HEC-FIA 3.0, and empirical methods developed by Jonkman (2007) and Jonkman et al. (2009). Results from the methods are compared, and comment is made about which is most suitable.
Keywords: potential loss of life, dam safety, risk analysis, retarding basins.