1998 – Safety of Meadowbank Dam Against Sliding Parameter Uncertainty
Richard I Herweynen
For concrete gravity dams, when the foundation’s value of cohesion is low, it is very difficult to meet the sliding criteria proposed by ANCOLD. Low cohesion is generally associated with serious foundation defects. This was the case for Meadowbank Dam, with a foundation having persistent horizontal seams containing material of a clayey silt size classification. By adopting the ANCOLD strength reduction factors, it was found that a large number of ground anchors would be required to meet the ANCOLD sliding criteria. During original design, extensive laboratory and insitu testing was performed on the seam material. This paper proposes a methodology for arriving at less severe strength reduction factors based upon a statistical analysis of the strength parameters measured in the Meadowbank Dam foundation.
Additionally, a probabilistic approach using a Monte Carlo simulation is used to give further weight to this argument. This paper concludes that the probability of Meadowbank Dam failing due to sliding is very low and within acceptable limits.
$15.00
Now showing 1-12 of 31 2948:
Related products
-
$15.00
1998 Papers
1998 – Estimating the Probability of Failure of Concrete and Masonry Gravity Dams
Learn moreKurt Douglas, Matt Spannagle and Robin Fell
This paper describes a method for estimating the probability of failure of concrete and masonry gravity dams through the dam or the foundation. The method is based on the research and analysis of historic failures and accidents performed at The University of New South Wales over the last two years. The method accounts for dam type; age; foundation; height/width ratio; dam performance observations; and monitoring and surveillance.
Learn more -
$15.00
1998 Papers
1998 – Risk Assessment of Dams – Future Directions for Victoria
Learn moreDavid Watson and John Adem
For several years risk management has been promoted by the Victorian Department of Natural Resources and Environment – Water Agencies as the key mechanism for the effective and efficient business management of dams. As part of an extensive water reform program, the Victorian Government announced in October 1997, a financial assistance package for the water industry which included funding for dam improvements covering a majority of large dam owners in the State. One of the conditions for receipt of these improvement funds was the need for each water authority to undertake a Business Risk Assessment of all significant and high hazard dams under its responsibility.
This paper discusses the Business Risk Assessment document based on a framework developed by Water Agencies after consultation with the industry and expands on the following reasons why the document was produced:
- To stress the importance and value of risk assessment in managing dams and the major role it plays in business planning and understanding dam performance. Risk assessment is not an alternative to the traditional engineering or deterministic approach but an enhancement,
- To identify the minimum assessment required and examples of different approaches such as portfolio risk assessments,
- To provide preliminary reference risk criteria to assist water authorities to determine appropriate business performance requirements. This preliminary criteria was developed from considering likely (although subject to change) outcomes of the current revision of Australian National Committee on Large Dams (ANCOLD) 1994 Risk Assessment Guidelines and other guidelines involving risk aspects recently or being prepared,
- To indicate future reporting and actions expected over the five year duration of the package including project evaluations and further risk assessments,
- To assist with inputs into ANCOLD’s continuing development and revision of guidelines, and
- To provide a platform for development over the next 18 months of an appropriate regulatory framework for covering all referable dams in the State. Key considerations will included performance based requirements encompassing risk management concepts, appropriate drivers which promote duty of care and associated legal issues and liabilities.
-
$15.00
1998 Papers
1998 – Risk Assessment for Hume Dam – Lessons from Estimating the Chance of Failure
Learn moreLeonard A McDonald and Chi Fai Wan
A risk assessment has been undertaken as part of a comprehensive review of the safety of Hume Dam. Use of risk assessment techniques, to assist in evaluating the safety of existing dams, is a relatively recent trend. Hume Dam was a particularly challenging subject for the application of risk assessment techniques at their present stage of development. The challenge lay in the number and diversity of dam elements to be analysed, in the number and complexity of the potential failure modes and in the fact that there were significant safety issues under normal operating conditions.
This paper outlines some of the key lessons learned from that phase of the risk assessment that was concerned with estimating the chance of dam failure. Some of the issues discussed have not previously been addressed in the literature and some demonstrate a clear need for improved analysis procedures.
Learn more -
$15.00
1998 Papers
1998 – Granit Ground Anchorage Integrity Testing – An Innovative Anchorage Condition Monitoring Procedure
Learn moreD. B. Edwards, B.H. Jackson & R. H. Wright
Ground anchorages are installed to support structures such as dams, slopes and tunnels. Failure of anchorages could be serious.
The condition of these critical supports is currently assessed by monitoring the load in the anchorages by either load cells or lift-off testing (jacking). Both methods are expensive and testing may damage the corrosion protection beneath the anchorage head.
A non-destructive testing method for ground anchorages needed developing and the UK Universities of Aberdeen and Bradford developed a testing system called GRANIT with patent applications on the system filed world-wide.
Full scale measurements were conducted during the construction of Penmaenbach and Pen y Clip Tunnels on the UK’s A55, where rock support was provided by prestressed rock anchorages. In all 9000 records of anchorage response were analysed.
A major finding from the research was that the response of the anchorages to the dynamic impulse motion produced by the blast loading depended on how the anchorage had been constructed and on the nature of the surrounding rock mass. If the prestress load in the anchorage was changed, or the free length increased, a noticeable change was observed in the response ‘signature’ as monitored by an accelerometer located at the anchorage head.
Applying a known impulse load to the anchorage head immediately after construction and measuring the response, provides a datum response signature for the intact anchorage. If the anchorage was to deteriorate in any way, eg loss of prestress, this should be noticeable on subsequent response signatures. This approach is the basis of the GRANIT system.
A short programme of anchor calibration testing for bolts was conducted in Hawkesbury sandstone in Sydney during March 1998 and developments in Australia and UK are proceeding.
Learn more -
1998 Papers
1998 – Heritage Planning for Dams
Learn moreTony Moulds
A dam owner is often surprised to learn that his dam has been listed on a heritage register. This is often the first indication that the dam has heritage significance.
This paper discusses the different types of heritage listing and what the implications are for an owner. It suggests that a prudent owner will find out whether he needs a heritage conservation plan, particularly where redevelopment or remedial work at the dam is contemplated. The paper describes the content of a typical conservation plan for a large dam and how it is implemented.
Learn more